Difference between revisions of "Church Inside Open Meeting"

From CCCWiki
Jump to: navigation, search
(Introduction)
 
(18 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
''Speaker: Michael''
 
''Speaker: Michael''
  
# Welcome
+
* Welcome
# Opening prayer
+
* Opening prayer
# Purpose: Inform, inspire and involve
+
* Purpose: Inform, inspire and involve
# Scene setting and re-stating of overall vision. "I've started, so I’ll finish!"
+
* Scene setting and re-stating of overall vision. "I've started, so I’ll finish!"
# Scope
+
* Overview over the meeting
##
 
# Overview over the meeting
 
  
= Vision and Options =
+
== Objectives ==
 +
The overall objective is to '''prepare the church for the next decades'''. In particular, the objectives are as follows (in no particular order):
 +
 
 +
* '''Flexibility'''
 +
** To build a sense of community
 +
** To seat more people
 +
** To align the seating with the New Testament model of the church
 +
** To align the seating with different service styles
 +
** To improve the usability of the church for extra-service activities
 +
* '''Worship'''
 +
** To draw people into the presence of God
 +
** To enhance the worship
 +
* '''Welcoming environment:'''
 +
** To improve the accessibility of the church and the welcoming of new comers; to provide an open and friendly environment
 +
 
 +
'''Questions about objectives'''
 +
 
 +
== Scope of the project ==
 +
* repair and painting of damaged surfaces
 +
* main entrance (glass doors vs. porch)
 +
* pews
 +
* floor
 +
* chancel area
 +
* lighting
 +
* audio/visuals
 +
* chancel area?
 +
* windows?
 +
 
 +
== Time scales ==
 +
Finish by summer 2012, 140th birthday of the church.
 +
 
 +
== Transformation of other Churches ==
 +
* [http://www.ststephenstonbridge.org/ St. Stephen's, Tonbridge]
 +
:[[File:st-stephens-before.jpg|300px]] [[File:st-stephens-after.jpg|300px]]
 +
* [http://www.stpats.org.uk/ St Patrick's, Wallington]
 +
:[[File:st-pats-before.jpg|300px]] [[File:st-pats-after.jpg|300px]]
 +
* [http://www.visitcumbria.com/amb/ambleside-st-marys-church.htm St Mary's Church, Ambleside]
 +
:[[File:st-marys-before.jpg|300px]] [[File:st-marys-after.jpg|300px]]
 +
 
 +
= Proposed Changes =
 
''Timing: Start at 1:00pm''
 
''Timing: Start at 1:00pm''
  
Line 18: Line 55:
 
== Introduction ==
 
== Introduction ==
 
''Timing: no more than 2 minutes''
 
''Timing: no more than 2 minutes''
 +
 
''Speaker: Steven''
 
''Speaker: Steven''
  
# Introduction to the ‘briefing’ to the church membership on outline structure for the meeting and the plans for the project.  
+
* Introduction to the ‘briefing’ to the church membership on outline structure for the meeting and the plans for the project.  
# Steven to link and ‘call up’ each speaker in turn (not all four speakers at the front together – too ‘heavy’)
+
* Steven to link and ‘call up’ each speaker in turn (not all four speakers at the front together – too ‘heavy’)
  
 
== Vision 21C Part III and Removal of Pews ==
 
== Vision 21C Part III and Removal of Pews ==
 
''Timing: 3-4 minutes''
 
''Timing: 3-4 minutes''
 +
 
''Speaker: Heather''
 
''Speaker: Heather''
  
Line 33: Line 72:
 
== Glass Doors ==
 
== Glass Doors ==
 
''Timing: 3-4 minutes''
 
''Timing: 3-4 minutes''
 +
 
''Speaker: Sue''
 
''Speaker: Sue''
  
* historic ‘barrier’ to entry to church for non-believers
+
* Historic ‘barrier’ to entry to church for non-believers
* need for Christians to be seen at worship.  
+
* Need for Christians to be seen at worship.  
 
* Reflection on ‘missed opportunity’ in mid-1980s – plea to not ‘make the same mistake again’
 
* Reflection on ‘missed opportunity’ in mid-1980s – plea to not ‘make the same mistake again’
  
 
== Windows ==
 
== Windows ==
 
''Timing: 3-4 minutes''
 
''Timing: 3-4 minutes''
 +
 
''Speaker: Howard''
 
''Speaker: Howard''
  
Line 48: Line 89:
 
== Welcome ==
 
== Welcome ==
 
''Timing: 3-4 minutes''
 
''Timing: 3-4 minutes''
 +
 
''Speaker: Wendy''
 
''Speaker: Wendy''
  
Line 55: Line 97:
 
== Cost ==
 
== Cost ==
 
''Timing: No more than 2  minutes''
 
''Timing: No more than 2  minutes''
 +
 
''Speaker: Steven''
 
''Speaker: Steven''
  
Line 60: Line 103:
  
 
== Tomb Stone Layout? ==
 
== Tomb Stone Layout? ==
 +
''Speaker: Michael''
 +
 +
== Lighting? ==
 +
''Speaker: Michael''
 +
 +
== AV? ==
 
''Speaker: Michael''
 
''Speaker: Michael''
  
Line 68: Line 117:
 
* Break into groups (number of groups depends on how many present) and invite church to ‘dream dreams’.
 
* Break into groups (number of groups depends on how many present) and invite church to ‘dream dreams’.
 
* Drawings, pens and cut outs (Marc’s suggestion). If group members have questions – add to sheet.
 
* Drawings, pens and cut outs (Marc’s suggestion). If group members have questions – add to sheet.
 
+
* CCC Inside group members to join each group and facilitate discussion. No general feedback at the end from every group!
CCC Inside group members to join each group and facilitate discussion. No general feedback at the end from every group!
+
* Groups will be ask to complete the [http://www.christchurchchislehurst.com/ccc-inside/feedback-form.doc feedback form].
 +
* Each group will given the following items:
 +
:[http://www.christchurchchislehurst.com/ccc-inside/feedback-form.doc Feedback form]
 +
:Print outs of the floor plan: 2 each (so groups can start again if necessary)
 +
:[[File:church-floor-plan.png|200px]]
 +
:Paper benches: 34 long ones, 12 short ones (need to be to scale to fit on the floor plan)
 +
:Chair stickers: about 100 round stickers (do not need to be exactly to scale)
 +
:Paper porch: 1 each
 +
:Paper glass doors: 1 each
 +
:Marker for prayer area: 1 each
 +
:Marker for worship band: 1 each
 +
:Marker A/V desk: 1 each
 +
:Coloured pencils (for drawing)
 +
:Glue(for sticking pieces on the plan): 1 each
  
 
= Wrap Up =
 
= Wrap Up =

Latest revision as of 08:17, 6 June 2011

Introduction

Timing: Start at 12:45pm, ca. 10 minutes (allow for flexibility) Speaker: Michael

  • Welcome
  • Opening prayer
  • Purpose: Inform, inspire and involve
  • Scene setting and re-stating of overall vision. "I've started, so I’ll finish!"
  • Overview over the meeting

Objectives

The overall objective is to prepare the church for the next decades. In particular, the objectives are as follows (in no particular order):

  • Flexibility
    • To build a sense of community
    • To seat more people
    • To align the seating with the New Testament model of the church
    • To align the seating with different service styles
    • To improve the usability of the church for extra-service activities
  • Worship
    • To draw people into the presence of God
    • To enhance the worship
  • Welcoming environment:
    • To improve the accessibility of the church and the welcoming of new comers; to provide an open and friendly environment

Questions about objectives

Scope of the project

  • repair and painting of damaged surfaces
  • main entrance (glass doors vs. porch)
  • pews
  • floor
  • chancel area
  • lighting
  • audio/visuals
  • chancel area?
  • windows?

Time scales

Finish by summer 2012, 140th birthday of the church.

Transformation of other Churches

St-stephens-before.jpg St-stephens-after.jpg
St-pats-before.jpg St-pats-after.jpg
St-marys-before.jpg St-marys-after.jpg

Proposed Changes

Timing: Start at 1:00pm

Overall co-ordination: Steven

Introduction

Timing: no more than 2 minutes

Speaker: Steven

  • Introduction to the ‘briefing’ to the church membership on outline structure for the meeting and the plans for the project.
  • Steven to link and ‘call up’ each speaker in turn (not all four speakers at the front together – too ‘heavy’)

Vision 21C Part III and Removal of Pews

Timing: 3-4 minutes

Speaker: Heather

  • An overview of ‘Phase 3’ – the completion of the overall ‘vision’.
  • Linkage between Phases 1 and 2 and what we now plan to do inside church – outline of the various ‘key’ elements.
  • Removal of pews – central to planning

Glass Doors

Timing: 3-4 minutes

Speaker: Sue

  • Historic ‘barrier’ to entry to church for non-believers
  • Need for Christians to be seen at worship.
  • Reflection on ‘missed opportunity’ in mid-1980s – plea to not ‘make the same mistake again’

Windows

Timing: 3-4 minutes

Speaker: Howard

  • The windows – the glory of the existing church windows and the fact that they currently cannot be seen properly.
  • Architect’s view and vision on what could be possible – reflection on Phases 1 and 2.

Welcome

Timing: 3-4 minutes

Speaker: Wendy

  • Church as a ‘warm’, comfortable place – not cold and off-putting.
  • Desire to create a church worship space that people would be happy to come into.

Cost

Timing: No more than 2 minutes

Speaker: Steven

  • Very brief statement on estimated cost, outline programme for planned works and construction strategy (‘who does what’)

Tomb Stone Layout?

Speaker: Michael

Lighting?

Speaker: Michael

AV?

Speaker: Michael

Interactive Session

Timing: 1:30pm Participants: Groups

  • Break into groups (number of groups depends on how many present) and invite church to ‘dream dreams’.
  • Drawings, pens and cut outs (Marc’s suggestion). If group members have questions – add to sheet.
  • CCC Inside group members to join each group and facilitate discussion. No general feedback at the end from every group!
  • Groups will be ask to complete the feedback form.
  • Each group will given the following items:
Feedback form
Print outs of the floor plan: 2 each (so groups can start again if necessary)
Church-floor-plan.png
Paper benches: 34 long ones, 12 short ones (need to be to scale to fit on the floor plan)
Chair stickers: about 100 round stickers (do not need to be exactly to scale)
Paper porch: 1 each
Paper glass doors: 1 each
Marker for prayer area: 1 each
Marker for worship band: 1 each
Marker A/V desk: 1 each
Coloured pencils (for drawing)
Glue(for sticking pieces on the plan): 1 each

Wrap Up

Timing: 2:10pm Speaker: Michael

  • Sum up, thanks, promise that we will look at everything suggested
  • Prayer to close.